Refresh cycles
Preparation, rather than procurement.
A job starts by establishing what the finished file must be able to do. Rows that cannot be verified are separated from rows that failed verification. Sizing comes before spending, on every job.
Intake review
Reading an existing file and reporting what is wrong with it before any work is proposed.
Sample first
A small extract to check against before the full build, so a misread brief costs nothing.
Delta reporting
On a refresh, naming the records that joined, left or changed since the last version.